On September 2, 2024, an update to the Yawal Constructor program was released, containing the following changes:
1. The sale of some accessories has been changed from pcs to packages and the number of items in packages has been reduced - details in the Sales Department.
2. The 'minor updates' mechanism has been changed so that the customer can decide on their installation.
3. New solution with hidden sash for TM77N system has been added.
4. The HKS sash solution for the TM77N system has been added.
5. Selection of movabe post cap for TM77N has been verified.
6. Selection of fireproof GU door lock 605.2183 has been verified.
7. Selection of door leaf croner connestors for PBI50N system has been verified.
8. Selection of glazing elements for L50 system has been verified.
9. Next handles drawings at construction view have been added.
10. Multiple cross-sections of constructions have been improved.
11. Reports from 'zgloszenia@yawal.com' has been verified.